Service 06 / 06 · Flooring

Tile, hardwood, LVP, carpet, polished concrete.

Subfloor prep is two-thirds of the job. Self-leveling, moisture testing, and a flat tolerance better than spec — before the finish goes down.

Typical scope500–25,000 sq ft
Lead time2–6 weeks
FinishF-number rated
Self-performedYes
What we do

Subfloor prep is two-thirds of the job. Self-leveling, moisture testing, and a flat tolerance better than spec — before the finish goes down.

Reco flooring runs through one project manager and our in-house finishing crew, on a locked schedule with weekly RFI cycles. The methods below are how we earn the standard — not the upgrade.

Subfloor preparation

Self-leveling pour to 1/8" in 10'. Moisture testing to ASTM F2170. Documented before finish material lands.

Polished concrete

Diamond-grind 200 to 3000 grit, densified and sealed. Mock-up panel for sheen approval.

Hardwood acclimation

Site-conditioned for 7+ days at occupancy temp/humidity before install.

FAQ

Common questions.

The questions we hear most often on this scope.

Engineered for slab-on-grade and below grade. Solid for above-grade with proper acclimation.